ସମ୍ପୂର୍ଣ୍ଣ ବୋରୱେଲ ପମ୍ପ ସ୍ଥାପନ ଗାଇଡ୍ |
ନିରାପଦ କିଙ୍ଗୱେଲ ଜଳମଗ୍ନ ପମ୍ପ ସ୍ଥାପନ - କେବୁଲ୍, ପାଇପ୍, NRV, କଣ୍ଟ୍ରୋଲ୍ ପ୍ୟାନେଲ୍ ଏବଂ ଷ୍ଟାର୍ଟଅପ୍ ଯାଞ୍ଚ ତାଲିକା |
କାର୍ଯ୍ୟଦକ୍ଷତା, ସୁରକ୍ଷା ଏବଂ ୱାରେଣ୍ଟି ପମ୍ପ କରିବା ପାଇଁ ସଠିକ ସ୍ଥାପନ ଗୁରୁତ୍ୱପୂର୍ଣ୍ଣ | ଉପଯୁକ୍ତ କେବୁଲ, ଫିଟିଙ୍ଗ୍, ସୁରକ୍ଷା ଉପକରଣ ଏବଂ ବ electrical ଦୁତିକ ସୁରକ୍ଷା ସହିତ ଏହି ମାନୁଆଲ୍ ଅନୁଯାୟୀ କିଙ୍ଗୱେଲ ଜଳମଗ୍ନ ପମ୍ପ ସଂସ୍ଥାପନ କରନ୍ତୁ |
ସଂସ୍ଥାପନ ପୂର୍ବରୁ ଯାଞ୍ଚ ତାଲିକା |
Before lowering the pump:
- Verify pump model matches borewell diameter and HP requirement
- Check borewell yield with test pumping if new
- Confirm cable size for depth and HP (dealer chart)
- Arrange GI/HDPE delivery pipe, NRV, foot valve if needed
- Ensure control panel with overload, dry-run protection and proper earthing
କେବୁଲ୍ ଚୟନ ଏବଂ ମିଳିତ |
Use flat submersible cable of correct sq mm for motor HP and installation depth. Poor cable causes voltage drop and motor failure.
- Joint cables only with approved waterproof couplers
- Never splice cable mid-borewell with tape alone
- Support cable separately from pipe weight using clamping at intervals
- Leave service loop at top for future maintenance
ପାଇପ୍, NRV ଏବଂ ଫିଟିଙ୍ଗ୍ |
- Use recommended pipe diameter for pump discharge
- Install NRV above pump to prevent backflow and impeller damage
- Tighten fittings to prevent air entry
- Align pipe centrally — avoid pump body touching borewell walls
- Lower pump and pipe slowly with sturdy mounting chain or rope on rated hook
ସୁରକ୍ଷିତ ଭାବରେ ପମ୍ପକୁ ବିସର୍ଜନ କରନ୍ତୁ |
- Attach pump to pipe at borewell head
- Lower section by section, coupling pipe as you go
- Maintain minimum submergence below water level at all times
- Set final depth per dealer recommendation (above borewell bottom)
- Secure top assembly on sturdy borewell head plate
Never drop the pump — impact damages impeller and seals.
ବ Elect ଦ୍ୟୁତିକ ସଂଯୋଗ ଏବଂ ସୁରକ୍ଷା |
Connect to control panel with:
- MCB and overload relay matched to motor FLA
- Dry run protector or water level sensor
- Proper earthing to prevent shock and surges
- Stabilizer if voltage fluctuates beyond ±10%
Three phase: verify correct rotation direction. Single phase: use recommended starter type for HP rating.
ଆରମ୍ଭ ଏବଂ ପରୀକ୍ଷା
First start procedure:
- Fill delivery line if required
- Check voltage at panel under load
- Run pump for 15–30 minutes and observe amperage
- Verify discharge at outlet — no air or vibration
- Register warranty with dealer after successful commissioning
କିଙ୍ଗୱେଲ pumps are factory load tested before dispatch.
ସଂସ୍ଥାପନ ପୋଷ୍ଟ ପୋଷ୍ଟ କରନ୍ତୁ |
- Clean strainer every 3–6 months
- Inspect cable joints annually
- Never run dry — monitor water level seasonally
- Schedule dealer service yearly
- Keep installation record and invoice for warranty claims
Professional installation through authorized କିଙ୍ଗୱେଲ dealers is recommended for warranty coverage.