ବିଶେଷଜ୍ଞ ଗାଇଡ୍ |

ସମ୍ପୂର୍ଣ୍ଣ ବୋରୱେଲ ପମ୍ପ ସ୍ଥାପନ ଗାଇଡ୍ |

ନିରାପଦ କିଙ୍ଗୱେଲ ଜଳମଗ୍ନ ପମ୍ପ ସ୍ଥାପନ - କେବୁଲ୍, ପାଇପ୍, NRV, କଣ୍ଟ୍ରୋଲ୍ ପ୍ୟାନେଲ୍ ଏବଂ ଷ୍ଟାର୍ଟଅପ୍ ଯାଞ୍ଚ ତାଲିକା |

9 ମିନିଟ୍ ପ reading ିବା | କିଙ୍ଗୱେଲ
ସମ୍ପୂର୍ଣ୍ଣ ବୋରୱେଲ ପମ୍ପ ସ୍ଥାପନ ଗାଇଡ୍ |

କାର୍ଯ୍ୟଦକ୍ଷତା, ସୁରକ୍ଷା ଏବଂ ୱାରେଣ୍ଟି ପମ୍ପ କରିବା ପାଇଁ ସଠିକ ସ୍ଥାପନ ଗୁରୁତ୍ୱପୂର୍ଣ୍ଣ | ଉପଯୁକ୍ତ କେବୁଲ, ଫିଟିଙ୍ଗ୍, ସୁରକ୍ଷା ଉପକରଣ ଏବଂ ବ electrical ଦୁତିକ ସୁରକ୍ଷା ସହିତ ଏହି ମାନୁଆଲ୍ ଅନୁଯାୟୀ କିଙ୍ଗୱେଲ ଜଳମଗ୍ନ ପମ୍ପ ସଂସ୍ଥାପନ କରନ୍ତୁ |

01

ସଂସ୍ଥାପନ ପୂର୍ବରୁ ଯାଞ୍ଚ ତାଲିକା |

Before lowering the pump:

  • Verify pump model matches borewell diameter and HP requirement
  • Check borewell yield with test pumping if new
  • Confirm cable size for depth and HP (dealer chart)
  • Arrange GI/HDPE delivery pipe, NRV, foot valve if needed
  • Ensure control panel with overload, dry-run protection and proper earthing
02

କେବୁଲ୍ ଚୟନ ଏବଂ ମିଳିତ |

Use flat submersible cable of correct sq mm for motor HP and installation depth. Poor cable causes voltage drop and motor failure.

  • Joint cables only with approved waterproof couplers
  • Never splice cable mid-borewell with tape alone
  • Support cable separately from pipe weight using clamping at intervals
  • Leave service loop at top for future maintenance
03

ପାଇପ୍, NRV ଏବଂ ଫିଟିଙ୍ଗ୍ |

  • Use recommended pipe diameter for pump discharge
  • Install NRV above pump to prevent backflow and impeller damage
  • Tighten fittings to prevent air entry
  • Align pipe centrally — avoid pump body touching borewell walls
  • Lower pump and pipe slowly with sturdy mounting chain or rope on rated hook
04

ସୁରକ୍ଷିତ ଭାବରେ ପମ୍ପକୁ ବିସର୍ଜନ କରନ୍ତୁ |

  • Attach pump to pipe at borewell head
  • Lower section by section, coupling pipe as you go
  • Maintain minimum submergence below water level at all times
  • Set final depth per dealer recommendation (above borewell bottom)
  • Secure top assembly on sturdy borewell head plate

Never drop the pump — impact damages impeller and seals.

05

ବ Elect ଦ୍ୟୁତିକ ସଂଯୋଗ ଏବଂ ସୁରକ୍ଷା |

Connect to control panel with:

  • MCB and overload relay matched to motor FLA
  • Dry run protector or water level sensor
  • Proper earthing to prevent shock and surges
  • Stabilizer if voltage fluctuates beyond ±10%

Three phase: verify correct rotation direction. Single phase: use recommended starter type for HP rating.

06

ଆରମ୍ଭ ଏବଂ ପରୀକ୍ଷା

First start procedure:

  • Fill delivery line if required
  • Check voltage at panel under load
  • Run pump for 15–30 minutes and observe amperage
  • Verify discharge at outlet — no air or vibration
  • Register warranty with dealer after successful commissioning

କିଙ୍ଗୱେଲ pumps are factory load tested before dispatch.

07

ସଂସ୍ଥାପନ ପୋଷ୍ଟ ପୋଷ୍ଟ କରନ୍ତୁ |

  • Clean strainer every 3–6 months
  • Inspect cable joints annually
  • Never run dry — monitor water level seasonally
  • Schedule dealer service yearly
  • Keep installation record and invoice for warranty claims

Professional installation through authorized କିଙ୍ଗୱେଲ dealers is recommended for warranty coverage.